Industrial electrical design
From a new plant to an expansion, under Brazilian standards.
Why it matters in Brazil
In Brazil, low voltage installations follow ABNT NBR 5410 and medium voltage installations ABNT NBR 14039. The connection must be approved by the local power utility, under its own technical standards. And NR-10 requires every organisation to keep its electrical design up to date (item 10.15.3).
Every engineering design, inspection or report in Brazil must be registered with an ART (Law 6.496/1977) by a professional registered with CREA (Law 5.194/1966). NR-10 also requires every organisation to keep the electrical design and records of earthing inspection and measurement (item 10.15.3).
What it covers
- service entrance and substation;
- panels, circuits and protection;
- short-circuit and selectivity studies;
- approval by the utility.
What you receive
- complete design with reports and diagrams;
- documentation for the utility;
- ART registered with CREA.
Who signs
Dario Cini, electrical engineer and occupational safety engineer, graduated from the University of Caxias do Sul, with more than 10 years of work in the industry of Rio Grande do Sul.
Professional registration: CREA-RS 211.450 (public check on the CREA-RS website).
Company: Cini Engenharia, CNPJ 25.268.313/0001-56 (check with the Brazilian Federal Revenue).
Every job is delivered with an ART, the registration of technical responsibility at CREA required by Law 6.496/1977: the name of the engineer in charge stays tied to the document.
Let us talk about your plant in Brazil
Tell us what you need: we reply with a written proposal covering scope, schedule and cost, before any site visit.
