Why it matters in Brazil

In Brazil, medium voltage substations follow ABNT NBR 14039 and the standards of the local utility. For transformers with PCB oil (askarel), Law 14.250/2021 requires their elimination: an old substation should be assessed before it becomes a legal problem.

What Brazilian law says

Every engineering design, inspection or report in Brazil must be registered with an ART (Law 6.496/1977) by a professional registered with CREA (Law 5.194/1966). NR-10 also requires every organisation to keep the electrical design and records of earthing inspection and measurement (item 10.15.3).

What it covers

  • moving from low to medium voltage;
  • new plant or expansion;
  • existing substation without documentation or at end of life;
  • upgrade for the free energy market.

What you receive

  • substation design, protection and earthing grid;
  • approval by the utility;
  • ART registered with CREA.

Who signs

Dario Cini, electrical engineer and occupational safety engineer, graduated from the University of Caxias do Sul, with more than 10 years of work in the industry of Rio Grande do Sul.

Professional registration: CREA-RS 211.450 (public check on the CREA-RS website).

Company: Cini Engenharia, CNPJ 25.268.313/0001-56 (check with the Brazilian Federal Revenue).

Every job is delivered with an ART, the registration of technical responsibility at CREA required by Law 6.496/1977: the name of the engineer in charge stays tied to the document.

Let us talk about your plant in Brazil

Tell us what you need: we reply with a written proposal covering scope, schedule and cost, before any site visit.